HawkinsCustom Construction
PergolasCovered PatiosOutdoor KitchensDecksCommercialGalleryAboutJournalService AreasContact
(555) 123-4567Request a Free Estimate
Treated lumber joist framing for a curved dock deck, laid out over a pond with a park pavilion visible across the water.

Our Process

No mystery, no moving target.

From the first phone call to the last sweep of the driveway, here is exactly what happens and who is responsible for it.

Our Process

How a project actually goes

No mystery, no moving target. Here is exactly what happens from the first phone call to the last sweep of the driveway.

01

We walk your yard

Nathan comes out, looks at the space, and asks what you actually want to do out there. Where the sun lands at four in the afternoon, where the gas and power are, what the HOA will allow. No sales pitch, no pressure, no charge.

02

A real design, not a guess

You get a drawing with dimensions, material specs and stain colors — enough to see it before it exists and enough to hand to an HOA architectural committee.

03

One number, in writing

An itemized, fixed bid. Everything that is included is on the page. If something genuinely changes, we tell you before we do it, not after. No change-order games.

04

Permits and inspections

We pull the city permit, schedule the inspections, and handle the HOA submittal packet. You do not chase paperwork.

05

We build it and we clean up

A start date you can plan around, a crew that shows up when we say, and a site that gets swept every evening. When we hand it over, it is finished — stained, sealed, and ready.

In Detail

What each of those actually means.

What the walkthrough actually covers

We look at where the afternoon sun lands, not where it is when we happen to be standing there. We check the slab, the roofline, where the gas and electrical are, how a truck can reach the build, and what the sightline looks like from inside your kitchen.

We also ask what you want to do out there. "Shade" is not a brief. Sunday afternoons with eight people and a grill is a brief, and it produces a different structure than a quiet spot to have coffee.

What is in the bid

Dimensions, member sizes, species, footing detail, roof material, ceiling finish, stain color, and every electrical and gas item. Line by line, so you can see what a change would actually cost rather than guessing.

One fixed number at the bottom. Not a range and not a "starting at."

What we handle so you do not

The city permit and the inspection schedule. The HOA architectural packet with elevations, a scaled site plan, material specs and stain color. Pulling the plat to verify setbacks and easements before we design anything.

You should not need to learn your city's development code to add shade to your backyard.

What the build looks like

A start date you can plan around and a sequence in writing. Footings and inspection, framing, roofing, ceiling, electrical, then finish and stain. Materials staged where they will not block your driveway.

The site gets swept every evening. When we hand it over it is finished — stained, sealed, cleaned up, with the permit paperwork in your hand.

The four questions to ask any builder

How deep are the footings and how did you arrive at that depth? How is the roof tie-in flashed? What species are the visible members? Is the finish applied before handoff? A large gap between two bids almost always lives in one of those four answers.

Covered patio with a richly stained cedar plank ceiling and cedar posts, running alongside a stucco home with tall arched windows.

Free Estimates

Tell us what you want to build.

Nathan will walk your yard, talk through what will actually work, and give you a written number. It costs nothing and there is no obligation on the other side of it.